September 22: Foundation Prep Complete
Pad 1 foundation preparation complete! Stone for the Superior Wall foundation has been placed and grade elevations checked. Future pier locations are marked by two square indentations in the ground.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Construction Management Services Provided By
Architecture
Relevant Links
George Woodward Company
RE:Vision Architecture
Magrann Associates
Blog Archive
►
2009
(10)
►
May
(2)
►
March
(5)
►
February
(3)
▼
2008
(31)
►
December
(7)
►
November
(5)
►
October
(2)
▼
September
(11)
Watch Foundation Wall Installation
Green Foundation Walls
September 22: Foundation Prep Complete
September 19: Foundation Drain
September 17: Soil Inspection
September 16: Excavation Discovery
Installing Curb Vents & Valves
Cutting into Water Main
Utility Lines
Opening the Street for Utilities
Setting the Site
►
August
(6)
No comments:
Post a Comment