skip to main
|
skip to sidebar
Wednesday, November 5, 2008
Watch the Video of Module 2
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Construction Management Services Provided By
Architecture
Relevant Links
George Woodward Company
RE:Vision Architecture
Magrann Associates
Blog Archive
►
2009
(10)
►
May
(2)
LEED Certified!
Landscaping Complete
►
March
(5)
Master Bed and Bath
Upstairs: Bed & Bath
Living Room and Foyer
Front Office
Dining Room
►
February
(3)
Kitchen Finishes
Final Exterior Finishes
Sidewalk Installation
▼
2008
(31)
►
December
(7)
Exterior Finishes Continued at Pad Site 1
Module Installation at Pad Site 2
Stitching Modules Together
Site Grading
Safety First!
Mechanical Systems
Exterior Finishes
▼
November
(5)
Pad 1 Roof Installation
Watch the Video of Module 2
Modular Box 2 Installation
Watch the Video
Modular Box 1 Installation
►
October
(2)
Preparing the Crawl Space
Foundation Walls for Pads 3 and 4
►
September
(11)
Watch Foundation Wall Installation
Green Foundation Walls
September 22: Foundation Prep Complete
September 19: Foundation Drain
September 17: Soil Inspection
September 16: Excavation Discovery
Installing Curb Vents & Valves
Cutting into Water Main
Utility Lines
Opening the Street for Utilities
Setting the Site
►
August
(6)
Water, Water Everywhere!
Drilling the Wells
Inside the Lines
Dirty Work
The Building Site
The Plan
0 comments:
Post a Comment