Final Exterior Finishes
The twin homes will soon receive tenants.
The rear porches at the first set of twin homes.
First and second floor covered porches at the second set of homes, sans railing.
Sidewalk and final exterior finishes complete at the first pad site.
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Construction Management Services Provided By
Architecture
Relevant Links
George Woodward Company
RE:Vision Architecture
Magrann Associates
Blog Archive
▼
2009
(10)
►
May
(2)
LEED Certified!
Landscaping Complete
►
March
(5)
Master Bed and Bath
Upstairs: Bed & Bath
Living Room and Foyer
Front Office
Dining Room
▼
February
(3)
Kitchen Finishes
Final Exterior Finishes
Sidewalk Installation
►
2008
(31)
►
December
(7)
Exterior Finishes Continued at Pad Site 1
Module Installation at Pad Site 2
Stitching Modules Together
Site Grading
Safety First!
Mechanical Systems
Exterior Finishes
►
November
(5)
Pad 1 Roof Installation
Watch the Video of Module 2
Modular Box 2 Installation
Watch the Video
Modular Box 1 Installation
►
October
(2)
Preparing the Crawl Space
Foundation Walls for Pads 3 and 4
►
September
(11)
Watch Foundation Wall Installation
Green Foundation Walls
September 22: Foundation Prep Complete
September 19: Foundation Drain
September 17: Soil Inspection
September 16: Excavation Discovery
Installing Curb Vents & Valves
Cutting into Water Main
Utility Lines
Opening the Street for Utilities
Setting the Site
►
August
(6)
Water, Water Everywhere!
Drilling the Wells
Inside the Lines
Dirty Work
The Building Site
The Plan
0 comments:
Post a Comment